HARBOR

LA28 · Olympic and Paralympic Games, July–August 2028

LA28 procurement, decoded.

The organising committee is buying right now. This page tells you where the work is posted, what it buys and when, which certifications actually open doors, and the one portal mistake that quietly costs small firms six months.

Free resource Verified 21 Oct 2026 24 destinations checked Live board linked, not copied
$4.0B
Addressable spend, as an estimate

LA28's CEO told a City Council committee it is “close to $4 billion” and would fluctuate. Not a published budget line.

~$1.0B
Small-business share

Derived: 25% of addressable spend. The part of the market with no geography test.

182
Forecast line items

177 distinct services; three appear twice under different categories. LA28 plan, March 2026.

5
Counties that count as local

Los Angeles, Orange, Riverside, San Bernardino, Ventura. Outside them, the 25% small-business share is the door.

This page began as notes from the American Ismaili Chamber of Commerce session on Olympic procurement in October 2026. It has since been rebuilt from primary sources, and none of it is their material or carries their endorsement. Figures are the organiser's own where published, and labelled where they are estimates — see references.

The one thing to get right

LA28 runs two systems with similar names and completely different jobs. Confusing them is the most expensive mistake in this market, and most guides make it.

 RAMP LALA28 Supplier Portal
What it isThe bid boardA supplier directory
Address rampla.org la28.supplierone.co
Do opportunities post here? Yes. Every one. Only here.3 No. In LA28's words: “Opportunities will not be posted on this site.”14
What you do Register, enable alerts, check weekly for the keyword LA28 Register once with accurate NAICS codes, then forget it
The failure mode

A firm registers on the Supplier Portal, gets a polite confirmation, and waits for an email that is never sent — by design. Months later it concludes the market is closed. It was never watching the board.

Why it is worth your time

Entry costs one Expression of Interest. That is an unusually low price for a programme of this size, and it is the single most useful fact in LA28's plan.

How to read the board

This page does not list current opportunities, on purpose. The board turns over weekly, and a list of dates on a static page is wrong within days — which is worse than no list at all, because you would plan around it.

  1. Go to RAMP, not the Supplier Portal. RAMP is the only platform where LA28 publishes a competitive procurement.3 The Supplier Portal is a directory whose own text says opportunities are not posted there.14
  2. Filter the organisation to LA 28. That single filter is the difference between the whole City of Los Angeles marketplace and the records that are actually the Games.
  3. Check it on a rhythm, not once. LA28's own guidance to businesses is to review RAMP at least every two weeks.6 Windows are short and deadlines get extended, so the cadence matters more than the diligence.
  4. Read the Expression of Interest, not the headline. LA28 opens EOIs to anyone registered, with no prescreening, then screens against contract-specific minimums.4 The minimums in the document decide, not your impression of who wins these things.
The board, live

Open the RAMP announcements board and set the organisation filter to LA 28. That link always carries today's records, which is exactly why this page does not.

Why there is no list here

An earlier version of this page carried twelve dated opportunities. It was accurate for about two days, and then it called live work closed. If you want a snapshot, take it from RAMP yourself and put a timestamp on it.

How LA28 buys

A deliberate two-step process, built so that a small firm is not eliminated on paperwork before anyone reads what it can do.

  1. Focused statement of work. LA28 drafts a narrow scope with minimum qualifications, pricing sheets and a timeline — proportionate to the actual risk, not to the worst case imaginable.
  2. Expression of Interest. Published on RAMP with broad access and no prescreening. LA28 screens for contract-specific minimums, then evaluates competitively on price, capability, approach and local participation. One production-agency roster drew over 600 respondents this way.
  3. Request for Quote or Proposal. The shortlist moves to the formal stage. On larger work, bidders must submit a subcontracting plan stating the percentage of contract value they will subcontract and naming known subcontractors — and that plan is scored.
  4. Award, then performance management. Primes report their subcontracting outcomes after award. The commitment does not end at signature.
The implication most firms miss

Because subcontracting plans are scored, a prime has a commercial reason to want you on its bid before the solicitation exists. Approach primes while they are assembling a response, with a capability statement and one named scope you can carry. You are an asset at that moment, not a supplicant afterwards.

The definitions that decide everything

LA28's targets are measured against addressable spend — the portion of its total expenditure that can be met locally. Sponsorship value-in-kind, broadcast contributions and existing public infrastructure are excluded before the targets apply.

TermLA28's definitionWeight
LocalHeadquartered or holding a principal office in Los Angeles, Orange, Riverside, San Bernardino or Ventura County.75% of addressable spend
Hyper-localHeadquartered or holding a principal office inside the City of Los Angeles itself.Explicit priority
SmallMeets the U.S. Small Business Administration size standard for its industry.25% of addressable spend
Micro10 or fewer employees, or 25 or fewer in manufacturing.Explicit priority

The asymmetry is worth sitting with. Local is a geography test you cannot pass from outside five California counties. Small is a size test with no geography at all. If you are outside the region, the 25% small-business share is the door, and subcontracting is the corridor.

Three lanes, three different games

The Games generate work through three separate channels, and they do not share a buyer, a portal or a rulebook.

Lane 1LA28 direct

Private buying, local-weighted

LA28 is a nonprofit funded by sponsorship, broadcast and ticketing. Its preference is geographic: 75% of addressable spend to Greater Los Angeles, 25% to small business. The local half is effectively closed if you are not in the five-county region. The small-business quarter carries no geography test at all — and that is the open door.

Lane 2Federal

Money that becomes local contracts

The 2028 Games are a National Special Security Event, with the U.S. Secret Service as lead federal agency. Congress funded Games security through FEMA grants rather than direct federal procurement, so the contracts surface downstream at state and local agencies. That makes this a watch-and-position lane, not a SAM.gov search.

Lane 3Regional

Public works running through 2028

LA Metro, Caltrans, the County and the City all buy Games-related work under ordinary public procurement rules, with periods of performance that run to the closing ceremony. Steady, well-funded, and gated by residency and pre-qualification rules.

On the federal numbers

The National Special Security Event designation is a matter of record. The aggregate funding figures that circulate for Games security come from trade press and committee statements; this page does not reproduce a total, because none has been reconciled to a primary appropriation here. Treat any specific federal number you see quoted about LA28 security as unconfirmed until you have found it in the legislation.

What it buys, and when

LA28 published a forward projection of 182 line items: category, expected quarter and a relative spend band. It is a projection, and LA28 says so, but it is the closest thing to a shopping list that exists.

CategoryProjected sourcingSpend
Software and ITQ2–Q4 2026, Q1–Q3 2027, Q2 2028$$$$
Janitorial servicesQ3 2027$$$$
Marketing servicesQ4 2026, Q3 2027$$$
Events managementQ2–Q4 2026, Q1, Q2, Q4 2027$$$
CateringQ2, Q3 2026, Q1, Q3 2027, Q1 2028$$$
Project managementQ2 2026, Q3 2027, Q1 2028$$$
SecurityQ3 2027$$
SignageQ4 2026, Q3 2027$$
Furniture and fixturesQ2 2026, Q3 2027$$
Waste containersQ4 2026, Q4 2027$$

Spend bands run from one to four dollar signs: a relative band, not a figure. The full 182-line projection is in the March 2026 plan, pages 14 to 18, with NAICS codes in the category rows.

Read the timing, not the category

The early quarters are weighted toward operational commodities and venue services, while most of the software, data, consulting and management categories sit in 2027.1 That is a reason to prepare now rather than watch now: the work you do on NAICS codes and a capability statement this quarter is what qualifies you when those open.

Are you ready to bid?

Procurement readiness has three faces, and firms usually fail on the one they have never tested. Check what is true today and this page will score you.

Financial

Operational

Administrative

0 / 21
Tick what is true and a verdict appears here.

Where you score low, two organisations give this help away free: ProcureLA for City of Los Angeles businesses, and Path to 2028 for the county. Both are aimed at firms at exactly this stage.

Certifications, honestly

The fastest way to waste a quarter in this market is to chase a certification your firm cannot hold. Here is which doors each one actually opens.

CertificationGeography requiredWhat it is worth
SBA small business8No geography. Size only.This is the definition behind LA28's 25% of addressable spend. Limits are set per industry.
SBA 8(a)7No geography, but a one-time, term-limited programme.“8(a) certification lasts for a maximum of nine years” — four development, five transitional. Apply when you are actually ready, because you do not get a second run.
California Small Business / DVBE9Administered by the state; the two tests differ.Useful for state work. This page does not restate the eligibility rules because they are specific and they change — read them at DGS before spending time.
LA County LSBE10LA County footprint.The Local Small Business Enterprise Preference Program, and certified LSBEs are paid within 15 days of an undisputed invoice — which speaks directly to the cash-flow problem.
SBA VOSB / SDVOSB16No geography; federal value nationally.Carries weight on federal set-asides and on a prime's small-business plan. No LA28 or California value on its own.
The constraint no paperwork moves

Read the eligibility rules at the administering body before you spend time on a certification. Several programmes test the qualifying individual as well as the company, and no filing fee changes where anybody lives or works. This page deliberately does not restate those rules, because they are specific, they differ between programmes, and a stale summary is worse than a link.

Do not buy every certification

Read the solicitations in your industry and let them set the regime. Certifications you never needed are months and money you cannot recover, and several of them are term-limited or available only once in a firm's life.

State, local and federal are not the same regime

This is where small firms burn money. The three acronyms people ask about most answer to federal money, not to this market.

RegimeWhat it isWhen it applies to you
CMMC11 Cybersecurity Maturity Model Certification, imposed through a DFARS contract clause. When a Department of Defense contract, or a DoD prime's flow-down, carries the clause.
CAS12 Cost Accounting Standards — how costs are measured, allocated and disclosed on covered federal contracts. Applicability is decided at contract level against a threshold, not by the kind of buyer you are selling to.
FOCI13 Foreign Ownership, Control, or Influence — part of the National Industrial Security Program. Tied to eligibility for access to classified information. Irrelevant to commercial or municipal work.
The distinction that saves a quarter

State and local procurement, including LA28, does not run on these regimes. LA28 is a privately funded nonprofit whose procurement plan sets its own compliance instrument — the Responsible Sourcing Code — and names no federal acquisition regime.1 It does not impose CMMC, CAS or FOCI. Those arrive with federal money and federal primes. If you are bidding city, county or LA28 work, your compliance burden is insurance, licensing, certifications, wage and labour rules, and sustainability criteria — not a cybersecurity maturity assessment.

Where you sit

Two questions get confused constantly: can I register on a portal, and am I eligible for a preference. They have different answers.

You are…Register on RAMP?“Local” to LA28?Your realistic route
In the City of LAYesHyper-local — strongest positionBid directly and claim local participation.
In the five-county regionYesLocalBid directly; expect hyper-local firms to edge you on some scopes.
Elsewhere in the USYes — registration is not residence-gated4NoSubcontract to a local prime, or bid scopes where local preference does not decide.
Outside the USYesNoPublic buyers generally require a US-established entity. Form a subsidiary, or partner with a US firm that carries you on the budget.

And the footprint is wider than Los Angeles. Oklahoma City hosts softball and canoe slalom, and football preliminaries reach New York, Columbus, Nashville, St. Louis, San José and San Diego. If you are outside California, that is the part of the map worth reading: the venue plan.

Insurance and bonding

Two different instruments, routinely conflated. One is nearly universal; the other is not.

 InsuranceBonding
Required?Almost alwaysOnly on some contracts, typically construction
Typical formGeneral liability for non-specialised servicesPerformance and payment bonds
The binding constraintThe limit. Some contracts require limits far above a small firm's standard policyWhether a surety will write it against your balance sheet
How firms failThey discover the limit requirement after winning, and lose the awardThey cannot obtain bonding and are excluded before evaluation

Ask a broker this week what a $1m, $2m and $5m general liability limit would cost and whether you qualify. Ask a surety what your current financials would support. Both answers are free, and both change which opportunities are worth your time.

What not to believe

Claims that circulate widely and do not survive contact with LA28's own publications. Repeating any of them will cost you credibility with a procurement officer.

ClaimWhat is actually true
“LA28 has a minority business set-aside.”Not supported. LA28 publishes 75% local and 25% small, defined by geography and SBA size. No race, ethnicity or diaspora goal appears in the plan or on its supplier pages.
“Register on the LA28 Supplier Portal to bid.”It is a discovery directory. LA28's own text says opportunities are not posted there. Bids are published and filed on RAMP.
“$17.6 billion is the Olympic procurement budget.”That is expected regional economic output. LA28's addressable spend is the figure that governs contracts, and it is roughly $4 billion.
“LA28 procurement is federal, so FAR and SAM.gov apply.”LA28 is a privately funded nonprofit buying under its own plan and Responsible Sourcing Code. Federal acquisition rules do not apply.
“LA28 will host about 10,500 athletes from 206 nations.”Those are Paris 2024 numbers for a single Games. LA28's own release says the Games will unite “more than 15,000” athletes across the Olympic and Paralympic Games.
“Boxing is not on the LA28 programme.”Outdated. Boxing is on the programme and LA28 publishes a sport page for it.
“The Games are at SoFi Stadium.”LA28 calls the Inglewood venue 2028 Stadium. Use the organiser's own name in anything you submit.

Your first ninety days

Ordered so that each step makes the next one possible. Nothing here requires a California office, except where it says so.

Days 1–7

  • Register on RAMP. Turn on the sports and entertainment notifications. This is the prerequisite for seeing any LA28 Expression of Interest.
  • Register on the LA28 Supplier Portal with the NAICS codes you actually deliver, not the ones that sound close.
  • Fix your NAICS codes. Too broad floods you; too narrow hides you.

Days 8–30

  • Write a one-page capability statement mapped to how LA28 says it evaluates: capability, depth of experience, approach, sustainability, local participation, workforce.
  • Read the twelve live records and the Q4 forecast. Decide which categories you could genuinely perform.
  • Ask a broker what a $1m, $2m and $5m general liability limit would cost, and whether you qualify.

Days 31–60

  • Pick three forecast categories where merit decides and geography does not disqualify you.
  • Identify three primes to approach while they are assembling a response. Subcontracting plans are scored, which makes a credible small-business partner an asset to them.
  • Book a free session with ProcureLA or Path to 2028 and take the readiness score with you.

Days 61–90

  • Submit one Expression of Interest. One is enough to be seen.
  • Hold one live teaming conversation.
  • Re-pull this page. The RAMP list turns over weekly and the forecast is dated March 2026.

References

Every numbered claim on this page points here. Where a claim could not be traced to one of these sources, it was removed rather than softened.

  1. LA28 Procurement Plan, March 2026, p. 4 — “a target of 75% local and 25% small business” https://la28.org/content/dam/latwentyeight/downloads/LA28ProcurementPlan2026.pdf
  2. LA28 Procurement Plan, March 2026, p. 5 — Definitions of Local, Hyper-Local, Small and Micro Business. https://la28.org/content/dam/latwentyeight/downloads/LA28ProcurementPlan2026.pdf
  3. LA28 Procurement Plan, March 2026, p. 9 — “RAMP is the only platform where all competitive procurements will be published”; 80,000+ businesses already registered. https://la28.org/content/dam/latwentyeight/downloads/LA28ProcurementPlan2026.pdf
  4. LA28 Procurement Plan, March 2026, p. 12 — “allowed broad access to EOIs without restrictive eligibility or pre-screening by RAMP” https://la28.org/content/dam/latwentyeight/downloads/LA28ProcurementPlan2026.pdf
  5. LA28 Procurement Plan, March 2026, p. 11 — Subcontracting plans “will be considered during RFP evaluation”. https://la28.org/content/dam/latwentyeight/downloads/LA28ProcurementPlan2026.pdf
  6. LA28 newsroom, 8 April 2026 — The 75/25 targets, RAMP routing, and “more than 15,000” athletes across both Games. https://la28.org/en/newsroom/la28-details-procurement-strategy-to-boost-regional-economy.html
  7. SBA — 8(a) Business Development program — “8(a) certification lasts for a maximum of nine years.” https://www.sba.gov/federal-contracting/contracting-assistance-programs/8a-business-development-program
  8. SBA — size standards — Industry size thresholds that define “small”. https://www.sba.gov/federal-contracting/contracting-guide/size-standards
  9. California DGS — SB/DVBE certification — The state application. Eligibility differs between the two programmes; read it at source. https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List-Folder/Apply-for-or-Re-apply-as-Small-Business-Disabled-Veteran-Business-Enterprise
  10. LA County DEO — Office of Small Business — The LSBE Preference Program, and payment within 15 days of an undisputed invoice. https://opportunity.lacounty.gov/how-we-help/office-of-small-business/
  11. DFARS 252.204-7021 — CMMC requirements — The contract clause that imposes CMMC on DoD work. https://www.ecfr.gov/current/title-48/chapter-2/subchapter-H/part-252/subpart-252.2/section-252.204-7021
  12. FAR Part 30 — Cost Accounting Standards — “the threshold for determining the tentative applicability of CAS at the contract level” https://www.acquisition.gov/far/part-30
  13. 32 CFR 117.11 — Foreign Ownership, Control, or Influence — FOCI inside the National Industrial Security Program, tied to eligibility for classified access. https://www.ecfr.gov/current/title-32/subtitle-A/chapter-I/subchapter-D/part-117/section-117.11
  14. LA28 Supplier Portal — “Opportunities will not be posted on this site.” Also: “Supplier.io does not require businesses to be owned or operated by individuals of any particular race or ethnicity.” https://la28.supplierone.co/
  15. RAMP LA — procurement announcements — The board. Filter the organisation to LA 28. https://www.rampla.org/s/announcements
  16. SBA — certifications — Veteran, women-owned and HUBZone programmes. https://www.sba.gov/certifications/

Sources, method, and what is unverified

This page is built from primary documents: LA28's own procurement plan, its supplier pages, its newsroom, the RAMP listing, and the publishing bodies' own sites. Where a number is an estimate rather than a published line, it says so.

Where the two big numbers come from

$4 billion. This is not a published budget line. It is what LA28's chief executive told the City Council's Ad Hoc Committee on the 2028 Games, in these terms: it is “close to $4 billion”, and “that number is going to probably fluctuate”. The $1 billion small-business figure is arithmetic on his 25% commitment, not a separate announcement. The press record is linked; the council transcript itself is not reproduced here.

182 forecast line items. Counted from the PDF's own table structure, not from a text dump. The plan carries 177 distinct services across pages 14 to 18; three of them appear twice under different category headings, which is why the row count and the service count differ.

How the checks were done

The RAMP board was read live in a browser on 21 October 2026 and all twelve LA28 announcements were captured with their dates. Every external link was requested directly and its response recorded. Two destinations do not answer an automated request and are still live: the Pacific Asian Consortium in Employment site blocks bot traffic, and the International Olympic Committee's domain refuses scripted requests. Both are marked in the link directory rather than removed.

Not verified, and stated as such

  • LA28's precise addressable spend. The $4 billion figure is the CEO's verbal testimony to the City Council, not a published budget line.
  • Which forecast categories will be solicited versus absorbed by sponsorship value-in-kind. Value-in-kind is excluded from addressable spend, so some categories may never reach RAMP.
  • LA28's total athlete quota and nation count. LA28 says “more than 15,000” athletes across both Games, but publishes no ceiling; do not reuse Paris 2024 numbers.
  • Games security funding totals. The National Special Security Event designation is on the record; the aggregate funding figures circulate in trade press and have not been reconciled to a primary appropriation here.

Known conflicts in the public record

LA28's October 2023 release described boxing as on hold. Boxing is now on the programme, and LA28 publishes a sport page for it. The 2023 release should not be quoted on that point.

Want this applied to your business?

HARBOR works with federal contractors and small businesses on procurement strategy: what to bid, what to skip, and how to be credible to a procurement officer in the first two minutes. This page is free, and it stays free. If you want the version built around your firm, that is a conversation.